PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Stripping the wall forms along column line 6.5 (G-D) Facing South-West (800x600).jpg Backfilled the underground roughing at room 173 Facing North (800x600).jpg Excavation for the underground roughing Facing North (800x600).jpg Installed safety cables and poles at Derrick -1 3rd Floor Facing North (800x600).jpg Metal decking at Derrick -1, -2 3rd Floor Facing East (800x600).jpg Underground Roughing along column line B Facing South (800x600).jpg Underground roughing at Sprinkler Valve Room (153A) Facing South-East (800x600).jpg Bolting Derrick -3 Facing South-East (800x600).jpg
Previous pageNext page Installed safety cables and poles at Derrick -1 3rd Floor Facing North (800x600)
Installed safety cables and poles at Derrick -1 3rd Floor Facing North (800x600)